FIDIC合同全文翻译与条文理解系列(73)——7.6 Remedial Work 修补工作

by 邵工——建筑结构工程师 Structural Engineer |2017年7月16日 | FIDIC合同, 一带一路
[隐藏]
FIDIC合同-121x75

一起学FIDIC合同

7.6 Remedial Work 修补工作

Notwithstanding any previous test or certification, the Employer may instruct the Contractor to:
尽管已有先前的任何试验或证书, 雇主仍可指示承包商进行以下工作:

(a) remove from the Site and replace any Plant or Materials which is not in accordance with the Contract,
将不符合合同要求的任何生产设备或材料移出现场,并进行更换;

(b) remove and re-execute any other work which is not in accordance with the Contract, and
去除不符合合同的任何其他工作,并重新实施;

(c) execute any work which is urgently required for the safety of the Works, whether because of an accident, unforeseeable event or otherwise.

实施因意外、不可预见的事件或其他原因引起的、为工程的安全迫切需要的任何工作。

If the Contractor fails to comply with any such instruction, which complies with Sub-Clause 3.4 [Instructions], the Employer shall be entitled to employ and pay other persons to carry out the work. Except to the extent that the Contractor would have been entitled to payment for the work, the Contractor shall subject to Sub-Clause 2.5 [Employer's Claims] pay to the Employer all costs arising from this failure
如果承包商未能服从任何此类符合第 3.4 款[指示]要求的指示,雇主应有权雇用并付款给他人从事该工作。除承包商原有权从该工作所得付款的范围外, 承包商应遵照第 2.5 款 [雇主的索赔] 的规定, 向雇主支付因他未履行指示而使雇主支付的所有费用。

解读:

拒收之后就是修补,本款对于不符合合同要求的工程,赋予工程师绝对的否则权。国内监理工程师在质量方面国家赋予类似的权力,当然,实质使用会具有一定的灵活性。

对于不可抗力,大家都应该齐心协力来应对,所以承包商立即响应工程师指令就是应该的了。

邵工——建筑结构工程师 Structural Engineer

建筑一网(www.jianzhu1.com)是一群同济大学毕业建筑和土木相关专业毕业的研究生和博士组成的技术团体。我们自2011年始即开始从事结构设计和研究工作, 积累了大量的研究成果和创新技术,并整理了对中国规范、FIDIC合同、欧洲规范和美国规范的总结笔记。此外, 团队还在结构产品领域有所研究,并推出了超薄夹层、板桁架、无檩网架、装配式厂房和装配式酒店等相关装配式产品。

Latest posts by 邵工——建筑结构工程师 Structural Engineer (see all)

百度已收录
分享:

邵工——建筑结构工程师 Structural Engineer

建筑一网(www.jianzhu1.com)是一群同济大学毕业建筑和土木相关专业毕业的研究生和博士组成的技术团体。我们自2011年始即开始从事结构设计和研究工作, 积累了大量的研究成果和创新技术,并整理了对中国规范、FIDIC合同、欧洲规范和美国规范的总结笔记。此外, 团队还在结构产品领域有所研究,并推出了超薄夹层、板桁架、无檩网架、装配式厂房和装配式酒店等相关装配式产品。

发表评论

电子邮件地址不会被公开。